VILLAGE ENGINEER :: VILLAGE HALL

SOUTH RUSSELL VILLAGE ENGINEER
NED F. FOLEY, P.E.
nfoley@ctconsultants.com

ASSISTANT VILLAGE ENGINEER


ERIC B. HAIBACK
ehaibach@ctconsultants.com

ROAD PROGRAM MAHAGER
AND PAVING SPECIALIST


CHUCK KADUN
ckadun@ctconsultants.com
The Village Engineer is responsible for the Capital Improvement Programs of the Village as well as is the approving authority for plans relating to new residential and commercial development in South Russell Village. He is also the Village contact relative to Flood Plain Issues.

Mr. Foley is Vice President and Treasurer of CT Consultants, Inc. and has been the Village Engineer since 1996. He is a graduate of the University of Detroit with a degree in Civil Engineering. He has been the City Engineer and Service Director in both Painesville and Mentor and during the time in Mentor, he was nominated for the American Public Works Association's Top Ten Public Officials in the Country.

Over the past 30 years, Mr. Foley has worked on projects in many of the communities in Lake and Geauga Counties and currently serves as the Village Engineer in Madison Village as well. In addition, Mr. Foley served 8 years as Madison Township Trustee.

Questions relating to current projects or general information about the Village's storm, sanitary, or water systems can be directed to Mr. Foley or Mr. Eric Hailback, Assistant Village Engineer who can be reached during business hours at :

35000 Kaiser Court
Willoughby, Ohio 44094
(440) 951-9000
(440) 951-7487 Fax

Information regarding current projects out to bid can be obtained via CT Consultants web page:

CT Consultants
Link: CT Consultants

or

CT Consultants Bid Information Index
Link: CT Consultants Bid Information Index

Current Active Village Projects

  • Chelsea Court Storm Sewer Improvement - January 2008
  • Annual Street Repaving Program

CONSTRUCTION PROCEDURES and DETAILS (non capital projects)

Before you start, we need the following:

  1. All signs and flagmen to be in accordance with Ohio Department of Transportation Manual of Uniform Traffic Control.
  2. Erosion control system and procedures shall be in compliance with the requirements of the village.
  3. Road openings, if any, to be saw cut, if not before, prior to repair. Pavement repair to be a directed by the Village Engineer.
  4. Pipe material under pavement plus 5' each side to be RCP Class IV or CL52 Ductile Iron Pipe.
  5. Other pipe may be VCP (C700 ES), PE, or PVC (SDR 35).
  6. All bedding to be Class B per details (#57 Limestone).
  7. Road backfill to be #57 Limestone compacted with concrete pavement. LSM if full depth asphalt pavement.
  8. At the discretion of the Village Engineer, the existing sewer main section is to be televised following tie in.
  9. NO WORK TO BEGIN OR OCCUR WITHOUT VILLAGE INSPECTOR ON SITE.

    CALL:
    440-951-9000 ext. 333 to schedule inspector. Need a minimum 24-hour notice, 48-hour to be sure. Cancellation of Inspector by 7:30 a.m. or you will incur 4-hour show-up charge.